talon
Re: Talos Energy
Outside of the U.S. and Canada, upstream projects move forward at a much slower pace. Zama is moving forward and first production is expected in 2024.
Go to Talos' website and see slides 20 and 21 of their November 18th presentation. Slide 21 shows the Zama Project timeline.
Talos has a lot more going for it than Zama, which has nothing to do with my valuation since all of my valuations are based on 2020 to 2022 operating cash flows. They are going to report a big increase in production from Q3 to Q4 2020.
Go to Talos' website and see slides 20 and 21 of their November 18th presentation. Slide 21 shows the Zama Project timeline.
Talos has a lot more going for it than Zama, which has nothing to do with my valuation since all of my valuations are based on 2020 to 2022 operating cash flows. They are going to report a big increase in production from Q3 to Q4 2020.
Dan Steffens
Energy Prospectus Group
Energy Prospectus Group