Callon Petroleum (CPE) Q2 Results
Posted: Thu Aug 03, 2017 7:51 am
Callon's Q2 results beat my forecast. Cash flow from operation per share increased from $0.27 to $0.28. Production growth is now expected to accelerate into yearend. - Dan
Comments from John White at Roth Capital 8/3/2017
It was, by our estimates, an in-line quarter for CPE on production, EPS, CFPS, and EBITDA. We note the lease operating expense guidance per BOE ($/BOE) for 2017 has been lowered from a mid-point of $6.25/BOE to $6.00/BOE, as efficiency in the field improved. We also note the operated completed well count guidance has been increased nicely, from 34.5 wells to 42 wells, or 22%, while capex is unchanged. Production guidance is unchanged.
It was a quarter of delineation drilling and well density testing for CPE. CPE completed delineation of the Wolfcamp A zone across the aerial extent of the Howard County acreage position. Successful Lower Spraberry well density testing led to a 15% increase in Monarch location inventory. Also, CPE deployed a 4th rig, which will work in the Delaware Basin at the Spur asset. CPE reiterated its intention to add a fifth rig in early 2018.
Comments from John White at Roth Capital 8/3/2017
It was, by our estimates, an in-line quarter for CPE on production, EPS, CFPS, and EBITDA. We note the lease operating expense guidance per BOE ($/BOE) for 2017 has been lowered from a mid-point of $6.25/BOE to $6.00/BOE, as efficiency in the field improved. We also note the operated completed well count guidance has been increased nicely, from 34.5 wells to 42 wells, or 22%, while capex is unchanged. Production guidance is unchanged.
It was a quarter of delineation drilling and well density testing for CPE. CPE completed delineation of the Wolfcamp A zone across the aerial extent of the Howard County acreage position. Successful Lower Spraberry well density testing led to a 15% increase in Monarch location inventory. Also, CPE deployed a 4th rig, which will work in the Delaware Basin at the Spur asset. CPE reiterated its intention to add a fifth rig in early 2018.