Ng “crashes” to 9.02
Causing sell off
If you want a gasser today might be the day
Holy crap ...as late as March
, it is anticipated that initial production can
commence in early to mid-November, and ramp up to a sustained level of at least 2 BCF per day
by the end of November, representing over 85% of the export capacity of the facility. The recovery
plan will utilize Freeport LNG’s second LNG loading dock as a lay berth until loading capabilities
at the second dock are reinstated in March 2023, at which time we anticipate being capable of
operating at 100% of our capacity
Europe is screwed...that should take care of our shortage..I wonder if the demented one twisted their arms.
Dan, time to redo the models
