Freeport delayed to mid November
Posted: Tue Aug 23, 2022 12:55 pm
http://www.newsrouter.com/NewsRouter_Up ... meline.pdf
Ng “crashes” to 9.02
Causing sell off
If you want a gasser today might be the day
Holy crap ...as late as March
, it is anticipated that initial production can
commence in early to mid-November, and ramp up to a sustained level of at least 2 BCF per day
by the end of November, representing over 85% of the export capacity of the facility. The recovery
plan will utilize Freeport LNG’s second LNG loading dock as a lay berth until loading capabilities
at the second dock are reinstated in March 2023, at which time we anticipate being capable of
operating at 100% of our capacity
Europe is screwed...that should take care of our shortage..I wonder if the demented one twisted their arms.
Dan, time to redo the models
Ng “crashes” to 9.02
Causing sell off
If you want a gasser today might be the day
Holy crap ...as late as March
, it is anticipated that initial production can
commence in early to mid-November, and ramp up to a sustained level of at least 2 BCF per day
by the end of November, representing over 85% of the export capacity of the facility. The recovery
plan will utilize Freeport LNG’s second LNG loading dock as a lay berth until loading capabilities
at the second dock are reinstated in March 2023, at which time we anticipate being capable of
operating at 100% of our capacity
Europe is screwed...that should take care of our shortage..I wonder if the demented one twisted their arms.
Dan, time to redo the models
